- 8 апреля, 2019
- By admin
- 921
- 0
Object before installing accordion-type smoke curtains.
On this object 12 accordion-type smoke protection curtains were installed.
The total area of the curtains was 2000m2.
Production time 10 weeks
The term of installation is 8 weeks.